With several years’ expertise in this line, we will be trusted by our benefits in aggressive value, 1-time delivery, prompt response, on-hand engineering help and excellent right after-revenue services.Moreover, all our production techniques are in compliance with ISO9001 standards. Advanced thermo remedy tools, this kind of as network heat treatment method oven, multi-use thermo therapy oven, and so on. With thorough requirments, we can also develop your particular made merchandise. Major Function:
1.EPTT EPTT,8 two files
2.EPTT steering
three.ten inch solitary motion clutch
4.540/720 EPTT output
5.EPTT strain elevate
six.The entrance and rear flat tires are 6.five-sixteen/11.two-24
7.With weigEPTT and basic safety rack
Principal EPTT Parameters:
the primary technological performance indicators | ||
Model No. | 604 | |
Technique | four Wheel variety | |
Usage | Multi transportation | |
Demension | mm | 3686*1511*2212 |
Length of Bear | mm | 1962 |
Distance of wheel(Front wheel/Again wheel) | mm | 960,1100,1245,1300/960-1300 |
Length of wheel(entrance wheel/back wheel)Adjustment | mm | 960,1100,1245,1300/960-1300 |
Min fat | kg | 1650 |
Front bear weight/back again bear weight | kg | 740/910 |
Max match excess weight(front/back again) | kg | 42/sixty |
Equipment shaft | eight two | |
Motor product | 4TE50 | |
Motor voltage | kW | 44.1 |
Client Go to:
Manufacturing facility Photographs:
Pre-EPTT Service:
1. Inquiry and consulting assist
2. Sample testing help
3. See our Manufacturing unit
Right after-EPTT Service:
1.shell out the double air tickets, lodging and food. Our technicists can assist you in regional place
two.In accordance to the requirement of the buyer, our business sends engineers for set up and commissioning in buyer’s site incXiHu (West Lake) Dis.Hu (West Lake) Dis. the coaching of abilities of buyer’s personnel on operation, upkeep, and so on.
three.EPTT the remedies for different farming atmosphere.
4. For the harm brought on by the customers, our organization provides the parts and accessories with EPTT cost.
5. Our factory supplies the sporting parts with the EPTT cost to clients.
Package deal ampEPTT:
EPTT will be completed in fifteen-20 operating daEPTTafter payment. It relies upon on your orEPTTquantity. And the transport time to the port is about 1-2 times.